logo

There will be disruptions in providing drinking water to some parts of Nasimi and Sabail districts.


Created: 11-04-2012 11:29

    “Azersu” OJSC carries out measures to improve drinking water supply systems of consumers and preparation to summer regime. Construction of 400m long transmission main (DN=300mm), as well as auxiliary water line (160mm) was completed in D.Aliyeva str. in order to supply consumers on a continuing basis with high quality drinking water and to prevent water losses. Until the evening of April 11 there will be disruptions in providing drinking water to some parts Nasimi and Sabail districts of Baku (some parts of D.Aliyeva, F.Amirov, U.Hacibeyov, Z.Aliyeva, K.Safaraliyeva, R.Zorge, Pushkin, Khagani and Nizami streets) due to joining the lines to the network. Azersu OJSC apologizes the subscribers due to anxieties.

   Note that, the operation of the cast iron line that laid in 1936 will be suspended after connection of new line to the network.